Project Description
Customer
Quadric
Project Number
61372
Date of Completion
April 2022
Duration of Project
4 Months
Value of Project
$10,000
Project Manager
Jimmy Huynh
Man Hours
1000 Hours
Client Contact
Peter Kowald
Scope of Works
Scope of works:
- Disconnection and removal of existing electrical services wiring and equipment becoming redundant as particularly indicated and as will obviously become redundant with the alterations and additions works specified
- Alterations and additions to existing switchboards
- Supply and installation of new distribution board
- Supply and installation of new cable containment systems
- Supply and installation of new sub-mains
- Supply and installation of new luminaires, complete with lamps, control gear etc.
- Supply and installation of new lighting sub-circuit wiring including plug bases for connection of all recessed luminaires
- Alterations and additions to existing lighting control systems including switches, switching centres, switch wires, dimmers, control wiring, etc.
- Supply and installation of new general purpose socket outlets and dedicated socket outlets as indicated on the drawings
- Supply and installation of new wired isolating switches for new permanently connected items of equipment as indicated on the drawings
- Supply and installation of new power sub-circuit wiring, accessories, etc. for the complete final power distribution system including final connections ready for service to all permanently connected items of equipment
- Alterations and additions to the existing integrated data/communications structed cabling system
- Testing, commissioning and final certification of the specified Works